Our projects

Manchester Airport Terminal 2
JSR Contracts Limited successfully completed a comprehensive soft strip demolition package at Manchester Airport Terminal 2. Our works included the safe removal of internal partition walls, hardcore, ceiling tiles, flooring materials, doors, windows, bathroom and kitchen fittings, disconnected lighting, plumbing services, temporary structures, carpets, upholstery, and other soft furnishings, along with the breaking out and removal of screed. The project was delivered safely, efficiently, and to the highest standards of quality.
Central Trade Park ( Chester )

JSR Contracts Limited delivered a complete soft strip demolition and asbestos removal package for this project. Our works included the safe removal of asbestos-containing materials (ACMs), internal strip-out works, floor covering removal, partition wall demolition, asbestos cement roof sheet removal, and the management of all waste logistics. Every stage of the project was completed in full compliance with UK regulations, leaving the site safe, clear, and ready for the next stage of refurbishment and redevelopment.

Eurolink - St Helens

JSR Contracts Limited carried out a full soft strip demolition as part of this project, carefully removing internal and partition walls, ceiling tiles, flooring, screed, doors, windows, bathroom and kitchen units, fixtures and fittings, disconnected lighting, plumbing services, temporary structures, carpets, and other soft furnishings. Our team completed the work safely and efficiently, taking care to minimise disruption while maintaining high health and safety standards throughout the project.

Farmfoods, Cathedral Retail Park
For this project, JSR Contracts Limited carried out a complete soft strip demolition, carefully removing internal and partition walls, ceiling tiles, flooring, screed, doors, windows, bathroom and kitchen fittings, disconnected lighting, plumbing services, temporary structures, carpets, upholstery, and other soft furnishings. Every stage of the work was completed safely and efficiently, with a strong focus on protecting the surrounding structure and maintaining high health and safety standards.
Kingsgate Shopping Centre
JSR Contracts Limited successfully completed a comprehensive soft strip demolition project, carrying out the safe strip-out of retail and storage areas across Levels three and four while preserving designated welfare facilities. Our works also included the removal of the stairwell between the two levels, roof-mounted mechanical and electrical (M&E) services using crane lifting operations, and the creation of an opening around the lift area to facilitate the next stage of construction. The project was delivered with a strong focus on safety, efficiency, and compliance.
Farmlands Ltd
For this project, JSR Contracts Limited completed a comprehensive soft strip demolition, carefully removing internal and partition walls, ceiling tiles, flooring, screed, doors, windows, bathroom and kitchen fittings, fixtures, disconnected lighting, plumbing services, temporary structures, carpets, upholstery, and other soft furnishings. Our team carried out the works safely and efficiently, taking care to protect the surrounding areas while maintaining a clean and well-organised site. The project was completed to a high standard.
Croxteth Fire Station

JSR Contracts Limited successfully completed the enabling works at Croxteth Fire Station, delivering a comprehensive package that included the safe management and removal of asbestos-containing materials (ACMs), general soft strip demolition, and full site waste logistics. Our team carried out the works in a safe, controlled, and efficient manner, ensuring all materials were handled and disposed of in accordance with current UK regulations.

Torkington Project
For this project, JSR Contracts Limited carried out a comprehensive soft strip demolition, including the removal of internal and partition walls, ceiling tiles, flooring, screed, doors, windows, bathroom and kitchen fittings, fixtures, disconnected lighting, plumbing services, temporary structures, carpets, upholstery, and other soft furnishings. The scope of works also included breaking out concrete walls and safely transporting hardcore materials down the lift shaft for efficient removal from site. Throughout the project, our team worked safely and methodically, ensuring the site remained well managed.
Sainsbury's Ex Homebase Refurbishment
At this Sainsbury's project, JSR Contracts Limited carried out the safe removal of refrigerated panelling installed at a height of approximately 7 metres. Using a scissor lift to provide safe access and a telehandler to carefully lower the panels to ground level, our team completed the work in a controlled and efficient manner while maintaining strict health and safety standards. The project was delivered with minimal disruption.
Rylands Project
JSR Contracts Limited successfully delivered a comprehensive soft strip demolition package for this project. The works included the careful removal of internal and partition walls, ceiling tiles, flooring, screed, doors, windows, bathroom and kitchen fittings, fixtures, disconnected lighting, plumbing services, temporary structures, carpets, upholstery, and other soft furnishings. Our team also carried out the controlled demolition of concrete walls and safely transported hardcore materials down the lift shaft for efficient removal from site. All works were completed safely, efficiently, and in line with strict health and safety standards, leaving the building clean and well managed.
Friden House (Leeds)
JSR Contracts Limited delivered a carefully planned soft strip demolition project, preparing the site for its next stage of development through the safe and systematic removal of internal building elements. Our works included the controlled removal of asbestos-containing materials, floor coverings, suspended ceilings, partition walls, and general internal strip-out across the site. We also coordinated the efficient segregation, handling, and removal of all demolition waste, maintaining the highest standards of health, safety, and environmental compliance. By combining technical expertise with meticulous project management, we ensured the site was handed over clean and safe.
Former Carpetright Feltham
JSR Contracts Limited completed a comprehensive soft strip demolition at the former Carpetright site in Feltham. The project involved the careful removal of internal and partition walls, ceiling tiles, flooring, screed, doors, windows, bathroom and kitchen fittings, fixtures, disconnected lighting, plumbing services, temporary structures, carpets, upholstery, and other soft furnishings. Our team carried out the works safely and efficiently, maintaining a clean, organised site while minimising disruption throughout the project.
Sunderland Project

JSR Contracts Limited successfully completed a comprehensive soft strip demolition project, including specialist works within an existing chicken shed structure. Our scope involved the careful removal of internal elements, fixtures, fittings, and associated materials, including the dismantling and clearance of the chicken shed areas. The project was carried out with a strong focus on safety, efficiency, and environmental responsibility.

Completed Projects

St. Johns Leicester, Dumfries, Leicester, Stock LFC, Sharston, I-motion Gym Rotheram,
New Castle, Former Flannels, HMP Deerbolt, Dronfield
Contact

Address: 4 Glyn Avenue

Bilston

Wolverhampton

WV14 8NL

Email

Phone

info@jsrcontracts.com

01902 497 404

© 2025. All rights reserved by JSR CONTRACTS LTD.